0 530

 



If you have any ideas for new projects please contact the Engineering Office at: (620-343-4260)


The 2017 Sidewalk Installation Project shall be the installation of new concrete sidewalk and ADA Ramps. This project will fill in several locations where there are missing links in the sidewalk and will improve pedestrian access to Logan Ave School.

Project areas are:

  • South Exchange St. (Logan Ave. to Norton Ave.)
  • South Cottonwood St. (Potwin to Norton)
  • 10th Ave. (Rural West to Alley)
You are here: